The waste tracking slip

    The Waste Follow-up Schedule (BSD), a major document throughout the DID
    It ensures the traceability of DIDs and is proof of their elimination for the responsible producer (who must keep it for 5 years).
    To simplify your administrative procedures, we take charge of the management of this official document and regulations at each stage of our services:

    • Upon receipt of the request to intervene, we publish the BSD, pre-filled according to the nature of the product;
    • During the collection, our driver has the client sign it on the day of the waste removal. The client keeps a copy;
    • On arrival on one of our platforms, the waste is weighed and checked. The BSDs, if conform to the waste received, are validated and sent back to the customer with the invoice;
    • Upon arrival at the treatment center, a copy of the slip is validated. A follow-up note is returned to the customer.